Solar Panel Installation and Roofing Installation in Belford, NJ | 39 Panels
Mike McCusker has been a Green Sun Energy Services client since March of 2019, when the roof and the solar array were bought on the same day. The roof was finished on 18 April 2019 and the array a month later. 2,000 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system carrying a 50-year warranty, aluminum drip edge along 269 feet of rakes, eaves and valleys, and a ridge vent along the peak.
