Patrick from Morganville, NJ has been a Green Sun Energy Services client since December of 2019, and booked the roof and the array on the same day. The roof came first, finished on 24 January: a single layer stripped to the sheathing and hauled away, then 3,300 square feet of new composition shingle in pewter gray with a 50-year warranty, along with new gutters. The array followed thirteen days later – 24 panels making 8.04 kW into a SolarEdge inverter with optimizers, and an estimated 10,074 kilowatt hours in the first year. JCP&L interconnected it in March. Doing the roof first is the only order that makes sense: a 50-year roof beneath a 25-year array means the panels should never have to come off and go back on partway through their life.
Project Facts
- Location
- Morganville, NJ
- Services
- Roofing Installation, Solar Panel Installation
- Client since
- December 2019
Solar
- Panels
- Hanwha Model # Q.PEAK DUO BLK-G6+ 335
- System size
- 8.04 kW
- Inverter
- SolarEdge SE6000H-US000NNC2
- Mounting system
- Ecolibrium Solar
- Estimated first-year production
- 10,074 kWh
Roof
- System
- GAF Timberline Lifetime Roofing System
- Area replaced
- 3,300 sq ft
- Warranty
- 50 years
