Solar Panel Installation

Solar Critter Guard in Wayne, NJ

Solar Panel Installation in Wayne, NJ | 9.38 kW Array with 28 LG Panels

Brian from Wayne, NJ has been a Green Sun Energy Services client since November of 2018. The contract was signed just before Thanksgiving and the array was commissioned on Valentine’s Day — a slow winter turnaround, and a normal one for a system permitted in December. It is 28 LG 335-watt panels on a SolarEdge inverter, 9.38 kW rated and designed for about 10,842 kilowatt-hours a year, and it went up with 148 feet of critter guard around it. The gap beneath an array is dry, shaded and out of reach of anything larger, which makes it the best nesting […]

Solar Panel Installation in Middletown, NJ

Roof, Solar, Generator and Seasonal Services in Middletown, NJ | Six Projects Since 2019

Judith from Middletown, NJ has been a Green Sun Energy Services client since August of 2019. Three contracts were signed on the same day that August and three crews came through before the year was out; she has been back twice since, for work of a completely different kind. A new roof, two layers off, and 192 feet of gutters: Two layers came off down to the plywood rather than a third going on over them – the right call whenever solar is following, because nobody wants to find soft decking after the panels are already up. Two thousand five

Solar Panel Installation in Middletown, NJ

Solar, Generator and Soft Washing in Middletown, NJ | 20.48 kW Array, 22 kW Backup

Subhek from Middletown, NJ has been a Green Sun Energy Services client since November of 2018, and the house is large in every direction that matters here: 5,500 square feet, a 400-amp service, and an exterior that takes nearly twelve thousand square feet of washing. 64 panels and 20.48 kW: Live by 28 January 2019: 64 LG modules across two SolarEdge inverters, 20.48 kW rated and estimated at 27,540 kilowatt hours in the first year. Two inverters rather than one is what an array of this size asks for – it keeps each within its sensible working range, and it

Standby Generator Service, Solar and Roofing in Kendall Park, NJ | 11.52 kW Solar and Generator Service, Client Since 2019

Kevin from Kendall Park, NJ has been a Green Sun Energy Services client since October of 2019, when he bought a roof and an array together. The generator in the yard was already there – another company installed it in 2014 – and its servicing came to us a few months later. 2,500 square feet of new roof, and 252 feet of gutters: Finished on 13 December 2019: a single layer stripped to the sheathing and carted away rather than roofed over, then 2,500 square feet of GAF Timberline HDZ in shakewood, warranted fifty years, with continuous soffit vents at

Solar Panel Installation in Lacey Township, NJ

Solar Panel Installation and Roofing Installation in Lacey Township, NJ | Two Layers Off and 34 Panels On

Alan Jefferys has been a Green Sun Energy Services client since March of 2017, when the roof and the solar array were bought on the same day. The roof was finished on 6 July 2017 and the array eight days later. Two layers off, 1,700 square feet on: This roof had been covered over once already, so two layers of old shingle came off down to the sheathing rather than one — twice the tear-off and twice the disposal on a compact roof. What went back on is GAF Timberline American Harvest rather than the standard line used on most

Solar Panel Installation in West Orange, NJ | 8.075 kW Array with Enphase Microinverters

Leonel from West Orange, NJ has been a Green Sun Energy Services client since June of 2025. The contract was signed in late June and the system was commissioned by the end of August: 19 Jinko 425-watt panels paired one for one with Enphase IQ8PLUS microinverters. With microinverters each panel reports and produces on its own, so the array is never held to the pace of its weakest module. It is rated 8.075 kW and designed for roughly 8,569 kilowatt-hours in its first year, and it went up with 182 feet of critter guard around it — closing the sheltered

Solar Panel Installation and Roofing Installation in North Middletown, NJ | Solar in Two Phases

James and Ellen Lafargue have been Green Sun Energy Services clients since April of 2016, when the roof and the first phase of a solar array were bought on the same day. The roof was finished on 28 May 2016 and the panels a week later. A second phase followed three years after that. 4,400 square feet, stripped to the deck: A single layer of old shingles came off down to the sheathing and left with the dumpster. Deck protection went over the exposed sheathing, then a GAF Timberline HDZ system in Williamsburg Slate carrying a 50-year warranty, aluminum drip

Roofing Installation, Solar Panel Installation and Solar Upgrades in Somerdale, NJ

Solar Panel Installation and Roofing Installation in Somerdale, NJ | A Replacement Array

Edward Getley has been a Green Sun Energy Services client since October of 2012, when we fitted a production meter to the solar system on this house. Five years later the original array came off, the roof was replaced, and a new array went back on. 2012: a production meter on the original system: The first job here was an Itron Centron digital production meter — a Class 200, 240 volt unit on a dedicated solar breaker in the main panel, built to the ANSI C12 accuracy standard. That is a meter whose readings are held to a tolerance somebody

Solar Panel Installation in Asbury Park, NJ

Solar Panel Installation and Soft Washing in Asbury Park, NJ | Seven Panels on Each of Three Faces

Katherine in Asbury Park has been a Green Sun Energy Services client since February of 2022. The array went up that June and we soft washed the house in April 2026. East, south and west, seven each: Twenty-one panels went onto this roof in three groups of seven — one facing east, one south, one west. The symmetry is not decorative, although on a roof this steep and this visible from the street it does no harm that the layout reads as deliberate rather than as whatever fitted. What the three aspects buy is a flatter production curve. A single

Solar Panel Installation in Tinton Falls, NJ

Generator, Solar, EV Charger and Holiday Lighting in Tinton Falls, NJ | Four Trades, Client Since 2020

Elizabeth from Tinton Falls, NJ has been a Green Sun Energy Services client since August of 2020. Four trades in five years, and they arrived in the reverse of the usual order – the generator first and the array last, with a car charger in between. A 16 kW Generac on a 200-amp managed switch: The load calculation asked for a minimum of 15 kW under NEC Article 220 Part IV and a 16 kW natural-gas Generac went in, running by January. It sits behind a 200-amp managed whole-house transfer switch with two load-management modules and whole-house surge protection. Those

Scroll to Top