Standby Generator, Solar and EV Charger Installation in Cream Ridge, NJ | A Charger
Chris from Cream Ridge, NJ has been a Green Sun Energy Services client since August of 2019. The generator and the array were bought together and went in five days apart; the charger followed four years later. A 22 kW Generac, and two well pumps: Commissioned on 23 October 2019. The calculation asked for a minimum of 17 kW under NEC Article 220 Part IV and a Generac rated 19.5 kW on natural gas went in – 22 kW were it running on propane – behind a 200-amp managed whole-house transfer switch. The load survey lists 2,900 square feet, two
