EV Charger Installation

The charger is usually the easy part. What takes the thinking is the panel it connects to, the run from there to wherever the car actually sits, and whether the service coming into the house can carry it. These are chargers we installed at New Jersey homes, and each one names the unit, the circuit it runs on and the electrical service behind it.

90 completed EV charger projects across 74 New Jersey towns, including 8 with a review written by the customer.

EV Charger Installation in Hazlet, NJ | An 11.5 kW Charger

Mark from Hazlet, NJ has been a Green Sun Energy Services client since September of 2024. The charger went in on 15 November: a hardwired ChargePoint Level 2 unit rated 11.5 kW on a dedicated 60-amp circuit. The load calculation put the minimum service at 108 amps against the 150-amp supply the house already had, so the circuit went in without the panel being touched. The township permit came back at the start of November and the inspection passed in December – roughly seven weeks from contract to a signed-off installation, most of it spent waiting on paperwork rather than […]

EV Charger Installation in Keyport, NJ | A Customer-Supplied Charger

Americo from Keyport, NJ has been a Green Sun Energy Services client since April of 2025. The charger went in that June: a hardwired ChargePoint Level 2 unit with a J1772 connector rated 11.5 kW, on a dedicated 60-amp circuit. The unit itself was supplied by the household rather than by us, which is a perfectly sensible way to do it – the equipment is often bought with the car, and what actually needs a contractor is the circuit, the permit and the inspection rather than the box on the wall. The load calculation put the minimum service at 99

Solar, Roofing and EV Charger Installation in Kenilworth, NJ | 22 Panels and a Matching Charger

Daniel from Kenilworth, NJ has been a Green Sun Energy Services client since July of 2022, and came back for a car charger two years later. The roof and the array went in four days apart. The charger, when it came, was chosen to match what was already on the wall. 3,800 square feet of new roof: Finished on 12 September 2022: a single layer stripped to the sheathing and carted away rather than covered over, then 3,800 square feet of composition shingle in pewter gray, warranted fifty years, with continuous soffit vents at the intake. 22 panels and 8.91

EV Charger Installation in Plainsboro, NJ | A Charger and a Warranty Visit

Boris from Plainsboro, NJ has been a Green Sun Energy Services client since May of 2024. The charger went in that September: a hardwired ChargePoint Level 2 unit with a J1772 connector rated 11.5 kW, on a dedicated 60-amp circuit. The load calculation put the minimum service at 121 amps against the 200-amp supply the house already had, so the circuit went in without the panel being touched. A workmanship warranty visit followed a fortnight after installation and was completed the same week it was raised – the part of a warranty that matters is not the wording but whether

Standby Generator Installation and EV Charger Installation in Bound Brook, NJ | Two Chargers and a Generator

Christopher from Bound Brook, NJ has been a Green Sun Energy Services client since October of 2024, and had both jobs finished a day apart the following March. A 17 kW Generac on two management modules: Commissioned on 3 March 2025. The calculation asked for a minimum of 11 kW under NEC Article 220 Part IV and a Generac rated 17 kW on natural gas went in – 18 kW on propane – behind a 200-amp managed whole-house transfer switch with whole-house surge protection and two smart management modules, one rated 100 amps and one 50. The house is 1,164

EV Charger Installation in Princeton, NJ | A Charger Beside the Meter

Jane from Princeton, NJ has been a Green Sun Energy Services client since March of 2025. The charger went in that May: a hardwired ChargePoint Level 2 unit rated 11.5 kW, mounted outdoors next to the meter on a dedicated 60-amp circuit. The load calculation put the minimum service at 107 amps against the 200-amp supply the house already had, so the circuit went in without the panel being touched. Mounting beside the meter keeps the run short, and a short run is the cheapest part of any electrical job – the cost of an EV charger is mostly in

EV Charger Installation in Jackson, NJ | An Outdoor Charger

Kyle from Jackson, NJ has been a Green Sun Energy Services client since September of 2025. The charger went in that November: a hardwired ChargePoint Level 2 unit rated 11.5 kW, mounted outdoors on a dedicated 60-amp circuit with surge protection and a service-disconnect switch. The load calculation put the minimum service at 47 amps against the 100-amp supply the house already had, so the circuit went in without the panel being touched. That calculation is the step worth insisting on: it is what separates a charger that can simply be added from one that needs the service upgraded first,

EV Charger Installation in Keansburg, NJ | An Outdoor Charger

Jennifer from Keansburg, NJ has been a Green Sun Energy Services client since January of 2024. The charger went in that May: a hardwired ChargePoint Level 2 unit rated 11.5 kW, mounted outdoors on a dedicated 60-amp circuit, with 121 amps of spare capacity measured on the service beforehand. Keansburg sits on Raritan Bay, and an outdoor charger there has to stand up to salt air as well as weather – the unit is rated for it, and the mounting and the conduit have to be chosen with the same thing in mind. Four months separated the contract from the

EV Charger Installation in Perth Amboy, NJ | An 11.5 kW Garage Charger

Gordon from Perth Amboy, NJ has been a Green Sun Energy Services client since December of 2024. The charger went into the garage in February: a hardwired ChargePoint Level 2 unit rated 11.5 kW on a dedicated 60-amp circuit, within ten feet of the breaker box. The load calculation put the minimum service at 106 amps, comfortably inside the supply the house already had. Running that calculation before anything is ordered is what separates a charger that can simply be added from one that needs a service upgrade first – and where the figure comes out above what a panel

EV Charger Installation in Hazlet, NJ | An 11.5 kW Garage Charger

John from Hazlet, NJ has been a Green Sun Energy Services client since September of 2023. The charger went into the garage two weeks later: a hardwired ChargePoint Level 2 unit rated 11.5 kW on a dedicated 60-amp circuit, within ten feet of the breaker box. The load calculation put the minimum service at 165 amps against the 200-amp supply the house already had, so the circuit went in without the panel being touched. Two weeks from contract to installation is quick for work that needs a township permit, and it is the sort of timeline a straightforward load calculation

EV Charger Installation in Union, NJ | An 11.5 kW Charger

Peter from Union, NJ has been a Green Sun Energy Services client since October of 2023. The charger went in that January: a hardwired ChargePoint Level 2 unit rated 11.5 kW, mounted outdoors beside the meter on a dedicated 60-amp circuit. The load calculation put the minimum service at 128 amps against the 200-amp supply the house already had, so the circuit went in without the panel being touched. Three months passed between the contract and the installation, most of it the township permit – the part of an EV charger job that takes longest and shows least, and the

EV Charger Installation in Garwood, NJ | An 11.5 kW Charger

Sean from Garwood, NJ has been a Green Sun Energy Services client since January of 2025. The charger went in that March: a hardwired ChargePoint Level 2 unit rated 11.5 kW, mounted outdoors on a dedicated 60-amp circuit. The load calculation put the minimum service at 147 amps against the 200-amp supply the house already had, so the circuit went in without the panel being touched. Garwood is one of the smallest boroughs in Union County, and the older housing stock there is exactly where that calculation matters most – a house built long before anyone imagined charging a car

Scroll to Top